
Long Wang
Delivered and in progress: 61 sites


Contact New Sky
Tell us about the site, how many restaurants you run, when you want to open, and what you need — stainless steel kitchens, interiors, signage — and we will suggest a next step.
| You bring |
|
|---|---|
| You take home |
|
The hidden systems run inside walls, above ceilings and under floors, so they must be finished before the floor is laid and the ceiling closed. Fixing one later means lifting the floor or opening the ceiling again. We cover what those systems cost on the restaurant MEP page.
Those estimates rest on the 168 restaurants we have built and are building, not on the per-square-metre rates floating around.
Sometimes the numbers say this site is not worth taking. Hearing that at the first meeting costs you one meeting. Hearing it later, once the lease is signed, costs you rent every month.
Asking what a restaurant costs to build is not enough: you have to ask whether that money comes back, and how long it takes.
Luu Van Sy, restaurant business adviser — Director, New Sky
There is no charge for the first working session.
If you only need to order workshop items, send that through this form too: kitchen stainless steel, furniture, signage (fascia signs, 3D letters, light boxes).
We hear about the site and the concept you have in mind, then set a time to meet.
We assess the site, compare it against models we have built, then work up a preliminary cost estimate covering the hidden items.
You take the numbers away and weigh them up. If you want to see for yourself, we invite you to the workshop.
Sometimes you just want to ask one question first. Call or message on Zalo and you reach the right person.
You are welcome to look through the New Sky company profile.
Download company profile (PDF)